Transparency over optimism
If a model is four weeks away, the quotation should say four weeks. Planning around a truthful lead time is more useful than a promise that cannot be checked.
Bangladesh does not lack solar panels. It lacks suppliers who can document what they sell, hold the stock they advertise, and answer the engineering question behind the price.
A commercial rooftop system is usually a six-week installation sitting on a twelve-month decision. When it slips, it is rarely because the design was wrong. It is often because a shipment arrived with the wrong model code, a warranty enquiry lacked a usable serial or invoice reference, or a quoted price expired between approval and purchase order.
Reliance Renewable Energy was established to address those failure points. We import and distribute AIKO high-efficiency modules and GoodWe inverters and storage into Bangladesh, and we aim to run the business around three disciplines: documented product, honest availability and quotations that explain their price basis.
We are a distributor, not an installer. Our customer is the EPC company, the dealer, the factory owner and the installer — the people who carry the project risk. Our success is measured by whether their next project is easier because they bought from us.

If a model is four weeks away, the quotation should say four weeks. Planning around a truthful lead time is more useful than a promise that cannot be checked.
Where manufacturers provide them, datasheets, certificates, serial records and warranty terms are checked and made available with the relevant order. In a tender-driven market, the paperwork is as valuable as the hardware.
We will tell a customer when a smaller module is the better engineering choice, even when the larger one carries more margin. Systems that perform create repeat customers.
A dealer who reorders regularly is more valuable to the programme than a one-off project. Pricing and availability decisions reflect that difference.
Bangladesh's solar market is shaped as much by notifications and approvals as by product quality. These are the three areas customers should confirm with the relevant authority before making a purchasing decision.
The government's rooftop solar programme targets 2,000–3,000 MW and identifies industrial, commercial and institutional rooftops as priority capacity. It is the strongest argument available for approaching factory and building owners.
Net-metering eligibility depends on the specific approved module model, not the brand. The exact model code should be checked against the current SREDA list before a customer is told a system qualifies.
Concessional duty windows for solar equipment change with each notification. HS codes and eligibility conditions should be confirmed per shipment rather than assuming a blanket rate.
Policy references are provided for context and are not legal or tax advice. Confirm current notifications, SRO conditions and approved-model lists with the relevant authority before contracting.
A distributor depends on each handover. These are the functions that must work in sequence for a project to arrive complete.
Supplier relationships, allocation and import planning.
Receiving checks, available serial records and stock control.
Sizing, compatibility and proposal preparation.
Dispatch scheduling and nationwide delivery.
Warranty coordination, documentation and claims.
Send a requirement, bill or project drawing. We will respond with a sized proposal and the assumptions behind the quotation.